Manuel Feria

Compositor

Previous work


School demo reel(2013)

School Projects

Group

Goal: Design and create a shot as a team within a pipeline.

Duration: 13 days over a 3 week period.

Reference(s): Continuum.

Gabinete fisioterapéutico cyl

UFO

Goal: Design and create a shot to develop the skills required to create computer generated mechanical vehicles.

Duration: 20 days over a 6 week period.

Reference(s): Star Wars Episode I.

Gabinete fisioterapéutico cyl

Ghost

Goal: Create a ghostly apparition which is both believable and cosmetically appealing. Blend together live action, green screen actor(s) and practical stock elements.

Duration: 14 days over a 4 week period.

Reference(s): Dr. Manhattan and Nightcrawler effects.

Gabinete fisioterapéutico cyl

Weathered Object

Goal: Create a digital replica of a weathered prop that is indistinguishable from the original with a focus on Textures & Shaders.

Duration: 13 days over a 3 week period.

Reference(s): Real wheatered object.

Gabinete fisioterapéutico cyl

X23

Goal: Creat a solid foundation of common VFX integration issues such as matchmoving CG to Actor movements, adding environment and actor interactive reflections to a CG object, matching practical lighting, interactive and/or contact shadows, track points paint out, digital make-up, and optical glows/glints.

Duration: 14 days over a 3 week period.

Reference(s): X23 character and Deadpool blades.

Gabinete fisioterapéutico cyl

Rod Removal

Goal: Remove the rod(s) of the shot.

Duration: Not specify.

Reference(s): None.

Gabinete fisioterapéutico cyl

Sign Replacement

Goal: Replace the signs in the shot. Be creative to make your own changes.

Duration: Not specify.

Reference(s): None.

Gabinete fisioterapéutico cyl

Logo Replacement

Goal: Replace the logo in the shot. Be creative to make your own changes.

Duration: Not specify.

Reference(s): None.

Gabinete fisioterapéutico cyl

Title

Goal: Build a 5-10 second title shot integrating 2D graphic elements into a live action background plate.

Duration: 8 days over a 2 week period.

Reference(s): Other walls.

Gabinete fisioterapéutico cyl